Difficult line
- Exploration Stage
- Station
- From
- Conductor
- Description
- We need to put a connecting track so that the ghost train can get onto the main line and depart. I would be happy to bring the tracks.
- Completed
- What heavy tracks. Is it possible that the next set of tracks I find will be lighter? I wish I could put down ghost train tracks without more physical exertion.